Which of the following is correct about the assumptions of reinvestment rates? O a. The NPV and IRR both assume the IRR

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Which of the following is correct about the assumptions of reinvestment rates? O a. The NPV and IRR both assume the IRR

Post by answerhappygod »

Which Of The Following Is Correct About The Assumptions Of Reinvestment Rates O A The Npv And Irr Both Assume The Irr 1
Which Of The Following Is Correct About The Assumptions Of Reinvestment Rates O A The Npv And Irr Both Assume The Irr 1 (39.82 KiB) Viewed 72 times
Which of the following is correct about the assumptions of reinvestment rates? O a. The NPV and IRR both assume the IRR as the rate of reinvestment. b. The WACC is always used as the assumed rate of reinvestment. O c The NPV and IRR both assume the WACC as the rate of reinvestment O d. The NPV assumes reinvestment at the WACC, whereas the IRR assumes reinvestment at the IRR. O e. The NPV assumes reinvestment at the IRR, whereas the IRR assumes reinvestment at the WACC.