2 Question 2. The expected rate of return of A stock is 30% and the standard deviation of the returns is 22%, while the

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

2 Question 2. The expected rate of return of A stock is 30% and the standard deviation of the returns is 22%, while the

Post by answerhappygod »

2 Question 2 The Expected Rate Of Return Of A Stock Is 30 And The Standard Deviation Of The Returns Is 22 While The 1
2 Question 2 The Expected Rate Of Return Of A Stock Is 30 And The Standard Deviation Of The Returns Is 22 While The 1 (58.17 KiB) Viewed 28 times
2 Question 2. The expected rate of return of A stock is 30% and the standard deviation of the returns is 22%, while the expected rate of return of B stock is 18% and the standard deviation of the returns is 15%. The correlation between the returns of A and B shares is 0.40 and the risk-free rate of return of T-bills is 3%. The FTSE100 index has a rate of return of 15% during the same period. Part A). Calculate the expected return and standard deviation of an equally-weighted portfolio containing stocks A and B. (5 marks) Part B). A risk manager assumes that the joint distribution of returns is multivariate normal and calculates the following risk measures for a two-asset portfolio: Asset Position Individual VaR Marginal VaR Component Var A £1002 -23.34. -0.1762 -£17.6 Be £100 -46.62 -0.44 -£44 Portfolio £2002 -61.62 -£61.6 If asset B is dropped from the portfolio, what is the reduction in portfolio Value at Risk (VaR)?4 (5 marks) Part C). What are BA and BB relative to the portfolio? + (5 marks) Part D). A small investment management firm measures absolute risk with a 99%, one-year VaR, which gives -£1.5 million. The firm wants to allocate this risk to two portfolio managers, each with the same VaR budget. Given that the correlation between managers is -0.7, the VaR budget for each should be?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply