A company producing an widgets has found that loose connection will cause the end product to be weaker than required. A

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A company producing an widgets has found that loose connection will cause the end product to be weaker than required. A

Post by answerhappygod »

A Company Producing An Widgets Has Found That Loose Connection Will Cause The End Product To Be Weaker Than Required A 1
A Company Producing An Widgets Has Found That Loose Connection Will Cause The End Product To Be Weaker Than Required A 1 (61.79 KiB) Viewed 93 times
A company producing an widgets has found that loose connection will cause the end product to be weaker than required. A partial FMEA is shown below with an occurrence rating of 4. Currently there is no testing or monitoring associated with this failure mode. Risk Priority Number (RPN) is calculated for each failure (fault) mode. Occurrence Detection Item Function Failure Mode Potential Potential effects Severity Causes of failure Rating of Failure mode RPN Rating Rating Loose Connection Weakness Widget connection of Part A to in widget Connector allows Part B strength slippage Bends, manufacture 4 fault 900 By introducing testing into the system, the company is able to reduce the Detection Rating to 4. What is the new RPN (after the changes to testing have been implemented)?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply