- Is To Be Built Through The A Roadway Mountains Cutting Slopes And Stabilizing Them Soil Sample Was Taken Out From Top O 1 (27.85 KiB) Viewed 28 times
is to be built through the A roadway mountains cutting slopes and stabilizing them. Soil sample was taken out from top o
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
is to be built through the A roadway mountains cutting slopes and stabilizing them. Soil sample was taken out from top o
is to be built through the A roadway mountains cutting slopes and stabilizing them. Soil sample was taken out from top of the mountains for various physical and mechanical testing. Condition of the initial soil sample obtained through boring is given in the figure below, 20 16 00 AKI 15 30 70