The figure below shows the cross-section of a concrete dam founded on permeable soil, below which there is an impermeabl
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
The figure below shows the cross-section of a concrete dam founded on permeable soil, below which there is an impermeabl
statement for the flow net shown in the Figure: 50 m- 1.6 m 6.3m Datum ZA 17.2 m B DE 9.4 m ANKANKAAV TEATEAU Figure 1 Number of flow tubes = 3 and number of equipotential drops = 10 Number of flow tubes = 3 and number of equipotential drops = 20 Number of flow tubes = 6 and number of equipotential drops = 20 Number of flow tubes = 6 and number of equipotential drops = 10 F
The figure below shows the cross-section of a concrete dam founded on permeable soil, below which there is an impermeable stratum. The permeability of the soil k = 1.25 x 10-5 m/s. Choose the correct