Assume the clear span is your last four digits of university number, for the given beam find the following: 1. Volume of the concrete 2. Cutting length of straight bars. 3. Cutting length of Bent-up bar. 4. Cutting length & Number of stirrups required. 5. Total weight of steel required in beam. 40 mm clear cover 108 @ 180 c/c stirrups 1012 Bentup bar I 300 Section A-A 230 2012 Anchor bar 2016 Main bar 570 Clear span X, (X) Clear span = 3501 mm A
Q2. (5 Points) an excavation is to be made for a reservoir 400m long and the width at the bottom is he last two digits of your university number. The side slope of the excavation has to e 2:1. Calculate the volume of earth work using prismoidal method if the depth of cavation is 5m. Assume level ground at the site.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!