a=1, b=9,c=7

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

a=1, b=9,c=7

Post by answerhappygod »

a=1, b=9,c=7
A 1 B 9 C 7 1
A 1 B 9 C 7 1 (144.23 KiB) Viewed 40 times
km Figure 2 shows a online diagram of a system in which three-phase generator is rated (300+abc) MVA, 20 KV with a subtransient reactance of 0.2 per-unit and with ts neutral grounded through a 0.4 0 reactor. The transmission line is 64 Km long with a series reactance of 0.5 The three-phase transformer T, is rated 350 MVA, 230:20 Kv with a leakage reactance of 0.1 per unit. Transformer T₂ is composed of three signle-phase transformers, each rated 100 MVA, 127:13.2 KV with a leakage reactance of 0.1 per unit. Two 13.2 KV motors M₁ and M₂ with a subtransient reactance of 0.2 per unit for each motor represent the load. M₁ has a rated input of 200 MVA with its neutral grounded through 0.4 Q current limiting reactor. M₂ has a rated input of 100 MVA with its neutral not connected to ground. Neglect phase shifts associated with the transformers. Choose the generator rating as base in the generator circuit and: a. Draw the positive sequence reactance diagram showing all reactances in per unit b. The M₁ and M₂ have inputs of (120+ab) and (60+ab) MW, respectively at (132+ab) KV, and both operate at unity power factor. Deermine the generator terminal voltage and voltage regulation of the line. (20 kV) (13.8 kV) M₁ (230 kV) O T₁ K३६ । 38 AYI M₂ T₂ men 38 Y1
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply