II. STATEMENT OF THE PROBLEM A substation rated 1250 kVA is operating at full-load at 0.8 pf lagging and to carry an add

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

II. STATEMENT OF THE PROBLEM A substation rated 1250 kVA is operating at full-load at 0.8 pf lagging and to carry an add

Post by answerhappygod »

Ii Statement Of The Problem A Substation Rated 1250 Kva Is Operating At Full Load At 0 8 Pf Lagging And To Carry An Add 1
Ii Statement Of The Problem A Substation Rated 1250 Kva Is Operating At Full Load At 0 8 Pf Lagging And To Carry An Add 1 (29.53 KiB) Viewed 47 times
Please make a rightful power phasor diagram using the
given statement of the problem.
II. STATEMENT OF THE PROBLEM A substation rated 1250 kVA is operating at full-load at 0.8 pf lagging and to carry an additional load of 170 kW at 0.85 pf lagging. With the mentioned power factor, the substation is experiencing inefficient electrical system: high power losses, high voltage drops in the electrical equipment, and high electricity bill. To reduce power losses and to reduce the electricity bill, power factor correction is to be of high importance and consideration.

1. A rightful power phasor diagram.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!