QUESTION 2 [45 pts] You are scheduling production of your popular Rustic Coffee Table. The table requires a top, four le

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

QUESTION 2 [45 pts] You are scheduling production of your popular Rustic Coffee Table. The table requires a top, four le

Post by answerhappygod »

Question 2 45 Pts You Are Scheduling Production Of Your Popular Rustic Coffee Table The Table Requires A Top Four Le 1
Question 2 45 Pts You Are Scheduling Production Of Your Popular Rustic Coffee Table The Table Requires A Top Four Le 1 (359.5 KiB) Viewed 43 times
QUESTION 2 [45 pts] You are scheduling production of your popular Rustic Coffee Table. The table requires a top, four legs, 1/8 gallon of stain, 1/16 gallon of glue, 2 short braces between the legs and 2 long braces between the legs, and a brass cap that goes on the bottom of each leg. You have 100 gallons of glue in inventory, but none of the other components. All items except the brass caps, stain, and glue are ordered on a lot-for-lot basis. The caps are purchased in quantities of 1,000, stain and glue by the gallon. Lead time is 1 day for ach item. COFFEE TABLE Top Glue Base Assembly Short braces Brass Caps b) Using the data for coffee table, build a labor schedule when the labor standard for each top is 2 labor hours; each leg including brass cap installation requires % hour, as does each pair of braces. Base assembly requires 1 labor-hour, and final assembly requires 2 labor- hours. What is the total number of labor-hours required each day, and how many employees are needed each day at 8 hours per day? (See Appendix A2.) A2. Labor schedule table Coffee Table Hrs Lead Master Schedule Required Time Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Table Assembly Top Preparation Assemble Base Long Brace (2) Short Brace (2) Leg (4) Total Hours Employees need @ 8 hrs. each Stain Long Legs braces