A local company has 3 appliance factories that meet the demand for washing machines from 2 nearby department stores. The
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
A local company has 3 appliance factories that meet the demand for washing machines from 2 nearby department stores. The
company has 3 appliance factories that meet the demand for washing machines from 2 nearby department stores. The follow diagram shows the possible shipping routes between factories and stores, as well as the freight cost (in hundreds of dollars) incurred washing machine on each of the routes. Additionally, the supply of each shipping point and the demand of each destination presented $7/lavadora Tienda fabrica Zapopan Oferta:50 Demanda 65 lavadoras lavadoras Fabrica Tonal Oferta 60 lavadoras $4/lavadora Fabrica 57/lavadora Ofer40 Demanda 80 lavadoras lavadoras The company wishes to plan how many washers to ship from each factory to each store, while seeking to minimize the total cost of shipments a) Obtain the initial solution using the Vogel method and report the table obtained. (8 points) b) Obtain the optimal solution of the p em, reporting the final table. Show, for that last iteration, the values of the multipliers and vijand the reduced costs of the nonbasic variables that confirm that the optimal solution has been reached (10 points) c) Interpret the optimal solution obtained. (7 points) 58/lavadora Sa/lavadora Slavadora
A local