- Factory Overhead Cost Variances The Following Data Relate To Factory Overhead Cost For The Production Of 7 000 Computers 1 (24.44 KiB) Viewed 67 times
Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of 7,000 computers
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of 7,000 computers
Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of 7,000 computers: Actual: Variable factory overhead $297,100 Fixed factory overhead 79,750 Standard: 7,000 hrs. at $51 357,000 If productive capacity of 100% was 11,000 hours and the total factory overhead cost budgeted at the level of 7,000 standard hours was $386,000, determine the variable factory overhead Controllable Variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $7.25 per hour. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Variance Amount Favorable/Unfavorable Favorable Controllable variance Unfavorable Volume variance Unfavorable Total factory overhead cost variance