Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each.

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each.

Post by answerhappygod »

Two Alternative Designs Are Under Consideration For A Tapered Fastening Pin The Fastening Pins Are Sold For 0 70 Each 1
Two Alternative Designs Are Under Consideration For A Tapered Fastening Pin The Fastening Pins Are Sold For 0 70 Each 1 (95.95 KiB) Viewed 27 times
could you please help me solving part (b) of the problem?
Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve equally well and will involve the same material and manufacturing cost except for the lathe and drill operations. Design A will require 12 hours of lathe time and 5 hours of drill time per 1,000 units. Design B will require 7 hours of lathe time and 8 hours of drill time per 1,000 units. The variable operating cost of the lathe, including labor, is $18.60 per hour. The variable operating cost of the drill, including labor, is $16.90 per hour. Finally, there is a sunk cost of $5,000 for Design A and $9,000 for Design B due to obsolete tooling. a. Which design should be adopted if 125,000 units are sold each year? b. What is the annual saving over the other design? 1:27 AM
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply