Use X = 7 if needed.

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Use X = 7 if needed.

Post by answerhappygod »

Use X = 7 if needed.
Use X 7 If Needed 1
Use X 7 If Needed 1 (32.36 KiB) Viewed 26 times
Question 3 a) Compare and contrast the uses of the standard penetration test (SPT) and the Cone Penetration Test (CPT) as a means of site investigation. (10 marks) b) A 3.X m x 3.X m square foundation is to be founded at a depth of 1.5 m below ground level in medium-dense sand with a bulk unit weight of 19 kN/m³ and a saturated unit weight of 20.X kN/m³. The water table is located 3.6m below ground level. The immediate settlement is to be limited to 25mm. Estimate the allowable load on the foundation using the standard penetration test data presented in Table 3 below and applying the appropriate correction factors. Table 3: SPT results Depth 1.5 3.0 3.8 4.6 5.4 6.4 (m) 7 12 12 18 20 25 SPT 'N' (18 marks) 2.2 9
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply