Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmenta

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmenta

Post by answerhappygod »

Munson Manufacturing In Gainesville Florida Wants To Arrange Its Four Work Centers So As To Minimize Interdepartmenta 1
Munson Manufacturing In Gainesville Florida Wants To Arrange Its Four Work Centers So As To Minimize Interdepartmenta 1 (29.25 KiB) Viewed 18 times
Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmental parts handling costs. The flows and existing facility layout are shown in the figures below. Figure 1. Parts Moved Between Work Centers A B с D 420 500 200 350 0 0 0 Figure 2. Existing Layout A -30 B с -30 -30 H a) For the existing layout, the cumulative "load x distance" or "movement cost" = feet (enter your response as a whole number). ABCD D 2100 75 0 700
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply