Each coffee table produced by Kevin Watson Designers nets the firm a profit of $10. Each bookcase yields a $15 profit. W

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Each coffee table produced by Kevin Watson Designers nets the firm a profit of $10. Each bookcase yields a $15 profit. W

Post by answerhappygod »

Each Coffee Table Produced By Kevin Watson Designers Nets The Firm A Profit Of 10 Each Bookcase Yields A 15 Profit W 1
Each Coffee Table Produced By Kevin Watson Designers Nets The Firm A Profit Of 10 Each Bookcase Yields A 15 Profit W 1 (39.38 KiB) Viewed 30 times
Each Coffee Table Produced By Kevin Watson Designers Nets The Firm A Profit Of 10 Each Bookcase Yields A 15 Profit W 2
Each Coffee Table Produced By Kevin Watson Designers Nets The Firm A Profit Of 10 Each Bookcase Yields A 15 Profit W 2 (13.66 KiB) Viewed 30 times
Each coffee table produced by Kevin Watson Designers nets the firm a profit of $10. Each bookcase yields a $15 profit. Watson's firm is small and its resources limited. During any given production period (of 1 week), 9 gallons of varnish and 12 lengths of high-quality redwood are available. Each coffee table requires approximately 1 gallon of varnish and 1 length of redwood. Each bookcase takes 1 gallon of varnish and 2 lengths of wood. The aim of the objective function for Kevin should be to Maximize the objective value. Decision variables: X = number of coffee tables produced /week Y = number of bookcases produced / week Objective function: Z= 10 X + 15 Y Subject to: (C₁) (C₂) 1X+1Y 1X + 2Y S9 S 12
15 hd Z 10 X 15 Y Subject to: (C₁) 1X+1Y 1X+2Y 12 (₂) X,Y 20 On the graph on right, constraints C, and C, have been plotted Using the point drawing tool, plot all the corner points for the feasible area. The optimum solution is: x-round your response to two decimal places) $9 12
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply