4. Determine the absolute minimum time it will take to complete the project if the project is crashed as far as possible

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

4. Determine the absolute minimum time it will take to complete the project if the project is crashed as far as possible

Post by answerhappygod »

4 Determine The Absolute Minimum Time It Will Take To Complete The Project If The Project Is Crashed As Far As Possible 1
4 Determine The Absolute Minimum Time It Will Take To Complete The Project If The Project Is Crashed As Far As Possible 1 (8.71 KiB) Viewed 21 times
4 Determine The Absolute Minimum Time It Will Take To Complete The Project If The Project Is Crashed As Far As Possible 2
4 Determine The Absolute Minimum Time It Will Take To Complete The Project If The Project Is Crashed As Far As Possible 2 (39.81 KiB) Viewed 21 times
4. Determine the absolute minimum time it will take to complete the project if the project is crashed as far as possible. Calculate the cost associated with this approach to the project.
Use the following information for Problems I through 5. Activity Immediate Normal Normal Predecessor(s Time Cost (S) ) (weeks) A none 10 16,000 B none 4 6,000 C A, B 6 12,000 D A 7,000 E B 28,000 F C, D, E 4,500 G F 7,200 H F 5,000 I 15,000 J 7,000 K 10,000 L 24,000 F H, I J K 7 14 3 4 2 5 2 5 10 Crash Time (weeks) 8 3 3 5 12 3 3 2 4 2 4 10 Crash Cost ($) 20,000 9,000 24,000 10,000 34,000 4,500 9,000 5,000 18,000 7,000 11,000 24,000