Write the steps of Line Balancing. From the table below, draw the 5 stations facility layout chart. If desired output ra

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Write the steps of Line Balancing. From the table below, draw the 5 stations facility layout chart. If desired output ra

Post by answerhappygod »

Write the steps of Line Balancing. From the table below, draw
the 5 stations facility layout chart. If
desired output rate is 3600 units/week then calculate the Cycle
time, Idle time, Theoretical minimum (#
of stations) and Efficiency.
Work Stations
A
B
C
D
E
F
G
H
I
Predecessor
-
A
A
B
B
C
C
D, E
F, G
Time (sec)
40
30
50
40
6
25
15
20
18