We are evaluating a project that costs $619,500, has a seven-year life, and has no salvage value. Assume that depreciati

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

We are evaluating a project that costs $619,500, has a seven-year life, and has no salvage value. Assume that depreciati

Post by answerhappygod »

We Are Evaluating A Project That Costs 619 500 Has A Seven Year Life And Has No Salvage Value Assume That Depreciati 1
We Are Evaluating A Project That Costs 619 500 Has A Seven Year Life And Has No Salvage Value Assume That Depreciati 1 (39.96 KiB) Viewed 18 times
We are evaluating a project that costs $619,500, has a seven-year life, and has no salvage value. Assume that depreciation is straight-line to zero over the life of the project. Sales are projected at 90,000 units per year. Price per unit is $43, variable cost per unit is $30, and fixed costs are $705,000 per year. The tax rate is 22 percent, and we require a return of 11 percent on this project. a-1.Calculate the accounting break-even point. (Do not round intermediate calculations and round your answer to the nearest whole number, e.g., 32.) a- What is the degree of operating leverage at the accounting break-even point? (Do 2. not round intermediate calculations and round your answer to 3 decimal places, e.g., 32.161.) b- Calculate the base-case cash flow and NPV. (Do not round intermediate 1. calculations. Round your cash flow answer to the nearest whole number, e.g., 32. Round your NPV answer to 2 decimal places, e.g., 32.16.) b- What is the sensitivity of NPV to changes in the quantity sold? (Do not round 2. intermediate calculations and round your answer to 2 decimal places, e.g., 32.16.) c. What is the sensitivity of OCF to changes in the variable cost figure? (A negative answer should be indicated by a minus sign. Do not round intermediate calculations and round your answer to the nearest whole number, e.g., 32.)
a-1. Break-even point a-2. DOL b-1. Cash flow NPV b-2. ANPV/AQ C. AOCF/AVC units
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply