Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Vacuum Vacuum necessary beneficial Ejectors 15 20+ 10* 10 10* 10° 10° 10° 10 Permeability (m/s) 10' Figure 1 Range of ap

Post by answerhappygod »

Vacuum Vacuum Necessary Beneficial Ejectors 15 20 10 10 10 10 10 10 10 Permeability M S 10 Figure 1 Range Of Ap 1
Vacuum Vacuum Necessary Beneficial Ejectors 15 20 10 10 10 10 10 10 10 Permeability M S 10 Figure 1 Range Of Ap 1 (174.69 KiB) Viewed 16 times
Vacuum Vacuum Necessary Beneficial Ejectors 15 20 10 10 10 10 10 10 10 Permeability M S 10 Figure 1 Range Of Ap 2
Vacuum Vacuum Necessary Beneficial Ejectors 15 20 10 10 10 10 10 10 10 Permeability M S 10 Figure 1 Range Of Ap 2 (77.25 KiB) Viewed 16 times
Vacuum Vacuum necessary beneficial Ejectors 15 20+ 10* 10 10* 10° 10° 10° 10 Permeability (m/s) 10' Figure 1 Range of application of dewatering techniques . (a) An extract of the corridor through a railway scheme is shown in Figure 2. It requires cutting of the existing ground levels between chainages 0+200 to 0+380 to the formation level of the subgrade. The cross-sectional area at each chainage is given in the diagram and the average swell factor of the soil is 1.25. It is intended to use 2 excavators, each having 1.6m³ bucket capacity; and 2 number 18 m³ dumper trucks. Using relevant calculations, establish which of the two scenarios below is a faster option and by how many weeks to complete the works: (i) one dumper truck assigned to each excavator (ii) two excavators filling one dumper truck at a time Existing levels 0 Drawdown (m) Dewatering not feasible and may not be necessary. Chainage 0+200 A = 150m² A = 225m² Chainage 0+230 A = 355m² Chainage 0+260 A = 405m² Chainage 0+290 A = 158m² Chainage 0+320 Single stage wellpoints Two stage wellpoints Deepwells Deepwells Sump pump A=255m² Chainage 0+350 A=505m² Chainage 0+380 Excessive seepage flows: cut-off or wet excavation may be necessary Formation levels Figure 2 Corridor of railway and cross-sectional areas at cutting chainages.
You may assume the following ● Excavator bucket has 75% fill capacity and output is 75 cycles per hour. • Dumper truck travel and repositioning time is 4.5 minutes. • A working day is 8 am - 4 pm with an hour-long break. ● 5 working days per week [20 marks] (b) The plan view and cross-sections through a pad foundation are shown on drawing number A101. Use the template below to prepare a reinforcement bending schedule for the pad foundation and the starter bars. Please note the information on the drawing carefully. If you make any further assumptions, please state these clearly. Deduction D (i.e. r,d) BAR TYPE No. of No. of TOTAL LENGTH SHAPE *A *B C BARS MEMBER MARK AND MBRS IN mm mm mm mm mm No. of EACH CODE BAR. mm SIZE EACH NOTE: Where applicable, please show your working out on separate paper and include this in your submission. [20 marks] E