Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The number of commercial vehicles using a newly opened section of a dual carriageway road is estimated at 1000 vehicles

Post by answerhappygod »

The Number Of Commercial Vehicles Using A Newly Opened Section Of A Dual Carriageway Road Is Estimated At 1000 Vehicles 1
The Number Of Commercial Vehicles Using A Newly Opened Section Of A Dual Carriageway Road Is Estimated At 1000 Vehicles 1 (90.34 KiB) Viewed 27 times
The Number Of Commercial Vehicles Using A Newly Opened Section Of A Dual Carriageway Road Is Estimated At 1000 Vehicles 2
The Number Of Commercial Vehicles Using A Newly Opened Section Of A Dual Carriageway Road Is Estimated At 1000 Vehicles 2 (68.37 KiB) Viewed 27 times
The number of commercial vehicles using a newly opened section of a dual carriageway road is estimated at 1000 vehicles per day. Assume that the type of pavement is flexible, the design life is 40 years, the subgrade is mainly consisting of silty clay material, the water table in the surrounding area is high and using thin construction with average quality drainage. Produce a detailed design for the different layers of the road using the Tables and Charts from the standards. Assume sub-base layer stiffness equal to 150 MPa. Use foundation class 2, EME2 asphalt material and follow a performance design approach for a single foundation layer. Specifically, define: i) Sub-base thickness (4 marks) ii) Total asphalt layer thickness (7 marks) iii) Surface, binder and base layers thicknesses (4 marks) (Clearly mark and identify all the design charts that you have used in your answer and submit all design charts and tables with your answer).
TYPE OF SOIL HEAVY CLAY SILTY CLAY SANDY CLAY SILT SAND (POORLY GRADED) SAND (WELL GRADED) SANDY GRAVEL (WELL GRADED) TABLE C 1 Equilibrium suction-index CBR values HIGH WATER TABLE CONSTRUCTION CONDITIONS: AVERAGE GOOD POOR PLASTICITY INDEX THIN THICK THIN THICK THIN THICK THIN THICK THIN THICK THIN THICK 70 1.5 2 60 1.5 2 2 50 1.5 2 2.5 40 2 2.5 3 30 2.5 3.5 4 20 2.5 4 5 10 1.5 3.5 6 - 1 1 1 1 20 40 60 * estimated assuming some probability of material saturating 2222222 2.5 LOW WATER TABLE CONSTRUCTION CONDITIONS: POOR AVERAGE GOOD 2 2 2.5 3.5 4.5 3.5 2 2 2.5 2.5 3 S 1 7 2 1.5 15 2 2.5 3 3 2.5 1 2 2 2 2.5 3.5 4 4 1 NNNM+n2 5 4.5 2 2 2 2 2.5 2 3 3 4 4 6 7 2 2 6 6 2 2.5 2.5 2.5 3.5 6 8 >8 2