39. The process is considered to be in control if all the following rules are followed EXCEPT A. Most of the points are

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

39. The process is considered to be in control if all the following rules are followed EXCEPT A. Most of the points are

Post by answerhappygod »

39. The process is considered to be in control if all the
following rules are followed EXCEPT
A. Most of the points are near the process average B.
Approximately equal number of sample points occur above and below
the center line. C. The sample point appears randomly distributed
D. Too many sample points close to the upper and lower control
limits E. There are no sample points outside the control
limits.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply