QUESTION 2 [20 Marks] A belt drive system is used to increase the speed from 1000 r/min to 1500 r/min. the design power
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
QUESTION 2 [20 Marks] A belt drive system is used to increase the speed from 1000 r/min to 1500 r/min. the design power
QUESTION 2 [20 Marks] A belt drive system is used to increase the speed from 1000 r/min to 1500 r/min. the design power is 50 kW and the operating conditions can be considered to be a class 3 heavy duty operating between 10 and 16 hours per day. The prime mover can be considered to be a heavy start. The distance between the pulley centres can be assumed to be approximately 1500 mm. Use wedge belts for your design. Design a drive system specifying pulley diameters, belt length and number of belts to be used..