CE310 Water Resources Engineering HW-7 Due: Layout of a storm sewer system is shown in figure. The sewer BE will be desi

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

CE310 Water Resources Engineering HW-7 Due: Layout of a storm sewer system is shown in figure. The sewer BE will be desi

Post by answerhappygod »

Ce310 Water Resources Engineering Hw 7 Due Layout Of A Storm Sewer System Is Shown In Figure The Sewer Be Will Be Desi 1
Ce310 Water Resources Engineering Hw 7 Due Layout Of A Storm Sewer System Is Shown In Figure The Sewer Be Will Be Desi 1 (145.16 KiB) Viewed 9 times
CE310 Water Resources Engineering HW-7 Due: Layout of a storm sewer system is shown in figure. The sewer BE will be designed for a storm having a return period of T= 100 years. Inlet times for all areas are accepted to be 10 minutes. The maximum allowable velocity in sewers is 4 m/s. The flow time between two successive manholes can be taken as 2 minutes. Take variable Manning's roughness coefficient with N=0.016. Street slope of BE is 2%. Commercial pipes are available at every 25 mm increments of diameters. Rainfall intensity for the project area can be determined from the following relation, i = 90(T,/t.)0.5 where T, is the return period in years, t, is the total time of concentration in minutes and i is the rainfall intensity in mm/hr. (1) 0-0.5 0.4 km? (2) C-0.4 0.0015 km C-0.35 0.01 km (5) C-0.30 0,01 km (3) C-0.55 0.02 km B 0-0.5 0.01 km (7) 0-0.4 0.002 km (8) C=0.7 0.02 km (9) 0-0.4 0.001 km
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply