b) A rapid filter plant is to treat 23,000 m² per day at a rate of 120 m/day. Determine the size and number of units req

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

b) A rapid filter plant is to treat 23,000 m² per day at a rate of 120 m/day. Determine the size and number of units req

Post by answerhappygod »

B A Rapid Filter Plant Is To Treat 23 000 M Per Day At A Rate Of 120 M Day Determine The Size And Number Of Units Req 1
B A Rapid Filter Plant Is To Treat 23 000 M Per Day At A Rate Of 120 M Day Determine The Size And Number Of Units Req 1 (77.37 KiB) Viewed 16 times
b) A rapid filter plant is to treat 23,000 m² per day at a rate of 120 m/day. Determine the size and number of units required if the filtration rate is not to exceed 180 m/day with one filter being backwashed, nor 240 m/day with one filter out of service and one filter being backwashed. How much water would be required to backwash one filter if the wash is at 1 m/min and continues for 10 min? c) For a purification plant serves 400000 capita with average rate of water consumption 250 lit/cap/day and filters operate with rate of filtration <150 m /day It is required to determine:- a. numbers and dimensions of rapid sand filters, b. capacity of the backwash storage tank that hold sufficient water for two consecutive 15 minutes washes at a velocity of 0.5 m/min., and c. numbers and dimensions of ground storage tanks
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply