6 A А 1 3 3 2 3 3 ол 5 6 N 5 7 B 7 8 B A 0 A B с 500 2000 0 1500 0 300 1600 1000 700 2000 lol D 700 1200 800 0 400

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

6 A А 1 3 3 2 3 3 ол 5 6 N 5 7 B 7 8 B A 0 A B с 500 2000 0 1500 0 300 1600 1000 700 2000 lol D 700 1200 800 0 400

Post by answerhappygod »

 1
1 (28.07 KiB) Viewed 15 times
map for road network (The number represents the time of each
road segment) and OD matrix of four residential areas A, B, C and D
have been provided in the following figure and table. Please use
appropriate methods to predict the traffic volume of each
section.
6 A А 1 3 3 2 3 3 ол 5 6 N 5 7 B 7 8 B A 0 A B с 500 2000 0 1500 0 300 1600 1000 700 2000 lol D 700 1200 800 0 400
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply