questions on the picture:
There are 15 units of footings and columns
Height of the top of column footing to the natural ground line = 1.5m
From natural ground line to the bottom of the beam = 3.0m
Depth of the beam = 0,30m
Slab thickness = 0.10m
Bend at the footing = 0.50m
Provide dowel for second floor provision = 0.50m
protective side covering for footing foundation = 0.075 m
Protective covering of column = 0.05 m
Consider length of hook and bending = 240mm
use 40cm for tie wire
Please Answer the following questions on the picture, choices are given. Thanks
4 Number of cut bars in 6 meter * (5 Points) 28 O 14 O 420 4 5 Total number of 16mm bar needed for 15 footings * (5 Points) 100 O 420 105 28
Using the following figures and data, answer the 4 Number of cut bars in 6 meter * (5 Points) 28 O 14 O 420 4 5 Total number of 16mm bar needed for 15 footings * (5 Poin
-