questions on the picture:
There are 15 units of footings and columns
Height of the top of column footing to the natural ground line = 1.5m
From natural ground line to the bottom of the beam = 3.0m
Depth of the beam = 0,30m
Slab thickness = 0.10m
Bend at the footing = 0.50m
Provide dowel for second floor provision = 0.50m
protective side covering for footing foundation = 0.075 m
Protective covering of column = 0.05 m
Consider length of hook and bending = 240mm
use 40cm for tie wire
Please Answer the following questions on the picture, choices are given. Thanks
2 * Number of cut bars in one footing * (5 Points) 28 14 420 4 3 Number of cut bars for 15 footings * (5 Points) 28 O 14 420 4
Using the following figures and data, answer the Using the following figures and data, answer the questions on the picture: There are 15 units of footings and columns He
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am