- Q4 For The Current System The Following Event Tree Was Obtained The Number Of Occurrences For The Outlet To Be Block 1 (27.06 KiB) Viewed 11 times
Q4. For the current system, the following event tree was obtained • The number of occurrences for the outlet to be block
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Q4. For the current system, the following event tree was obtained • The number of occurrences for the outlet to be block
Q4. For the current system, the following event tree was obtained • The number of occurrences for the outlet to be blocked is 0.4 . The probability of the failure of the PSDS, PSVs, rupture disk are 0.01,005, 0.1 PSV PSV2 RD Gas outlet Pressure switches LU Separator Gasolland water met PSD: PSD2 Fluid Out a) Calculate the success of the safety function of the system b) What will the probability of the failure for the number of occurrences per year for the gas flowing out of rupture disc? What will the probability of the failure for the number of occurrences per year for the gas relieved to flare? a) What will the probability of the failure for the number of occurrences per year for the PSDs no working? Papo Initiating PSDs do not PSV do not dove flow into re separator Rupture disc does not open Outcomes Rupture or explosion of separator True True Fale Gastowing out of rupture de Gas outlet blocked Gas relieved to fare False Controlled shutdown no gasos