10.16 Major appliances are assembled on a production line at the rate of 30/hr. The products are moved along the line on

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

10.16 Major appliances are assembled on a production line at the rate of 30/hr. The products are moved along the line on

Post by answerhappygod »

10 16 Major Appliances Are Assembled On A Production Line At The Rate Of 30 Hr The Products Are Moved Along The Line On 1
10 16 Major Appliances Are Assembled On A Production Line At The Rate Of 30 Hr The Products Are Moved Along The Line On 1 (39.77 KiB) Viewed 20 times
10.16 Major appliances are assembled on a production line at the rate of 30/hr. The products are moved along the line on work pallets (one product per pallet). At the final workstation, the finished products are removed from the pallets. The pallets are then removed from the line and delivered back to the front of the line for reuse. Automated guided vehicles are used to transport the pallets to the front of the line, a distance of 300 ft. Return trip distance (empty) to the end of the line is also 300 ft. Each AGV carries four pallets and travels ala speed of 150 ft/min (loaded or empty). The pallets form queues at each end of the line that neither the production line nor the AGVs are ever starved for pallets. Time required to load each pallet onto an AGV 12 sec; time to release a loaded AGV and move an empty AGV into position for loading at the end of the line = 10 sec. The same times apply
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply