130 CHAPTER SEVEN 2. Determine the logical steps to reduce the following project to its shortest duration, D 6 E B Til

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

130 CHAPTER SEVEN 2. Determine the logical steps to reduce the following project to its shortest duration, D 6 E B Til

Post by answerhappygod »

130 Chapter Seven 2 Determine The Logical Steps To Reduce The Following Project To Its Shortest Duration D 6 E B Til 1
130 Chapter Seven 2 Determine The Logical Steps To Reduce The Following Project To Its Shortest Duration D 6 E B Til 1 (23.43 KiB) Viewed 100 times
130 Chapter Seven 2 Determine The Logical Steps To Reduce The Following Project To Its Shortest Duration D 6 E B Til 2
130 Chapter Seven 2 Determine The Logical Steps To Reduce The Following Project To Its Shortest Duration D 6 E B Til 2 (36.29 KiB) Viewed 100 times
130 CHAPTER SEVEN 2. Determine the logical steps to reduce the following project to its shortest duration, D 6 E B
Tilme Slope $/Day Activity Cost Difference 0 Difference 0 A B C Time Normel 3 5 6 6 B 2 3 Time Crash 3 4 3 3 4 1 2 2 5 Cost Normal S600 $250 $180 $300 $200 $500 5700 $900 $100 Cost Crush $600 $340 SR40 $450 $340 $500 $140 31000 $100 E F G H J 0 5 Activity ta Can Be Shorten Shortened NII Cost Days per Shortened Day Cost for Project Cycle Total Cost Duration Cycle o 1 4 5 6 7 B