- A Process Process 386 Is Under Study To Be Controlled Using Control Limits And X And R Charts A Process That Is Expe 1 (61.41 KiB) Viewed 92 times
A process (Process #386) is under study to be controlled using control limits and X and R charts. A process that is expe
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
A process (Process #386) is under study to be controlled using control limits and X and R charts. A process that is expe
A process (Process #386) is under study to be controlled using control limits and X and R charts. A process that is expected to have a measured mean of 15 units has been sampled 20 times, using 5 samples each time for a total of 100 samples. The values that were measured are given below. In addition, for your convenience, the mean (X) and range (R) of each set of samples is also provided. Samples from process to be controlled Sample Number Sample Values Mean (X) ( 23.91 Range (R) 1 23.51 123.51 23.71 123.91 24.91 1.40 12 23.71 124.11 24.11 24.71 24.91 24.31 1.20 3 23.31 25.31 26.11 24.11 24.91 125.51 25.11 24.87 24.99 12.80 0.60 4 24.71 25.31 24.91 125.51 5 23.91 25.51 26.51 27.11 25.71 3.20 6 23.31 24.91 27.11 27.11 123.91 31.11 125.27 30.99 7 29.51 31.31 31.91 31.11 23.91 3.80 2.40 2.80 18 23.31 23.91 25.51 26.11 24.55 9 23.71 24.71 24.71 25.31 124.91 26.11 26.11 |26.31 27.11 126.51 25.31 25.79 10 3.40 1.80 1.80 13.40 11 24.91 26.11 125.51 23.71 25.71 124.51 26.71 26.71 25.79 124.75 12 23.31 125.51 13 25.51 25.31 23.51 23.11 23.71 125.51 23.31 23.91 25.51 24.11 26.51 24.91 14 3.00 1.80 123.71 |23.83 15 124.11 24.31 26.71 24.55 3.00 16 23.91 24.71 125.51 25.71 25.31 2.80 |26.71 26.51 17 23.91 24.91 25.11 26.31 2.60 125.35 25.51 18 23.11 25.71 125.91 26.11 26.71 3.60 19 24.11 25.31 25.39 3.20 23.71 23.51 26.91 26.31 26.91 26.51 20 23.51 25.11 24.99 3.00 Using the above table of samples the preliminary UCLR is calculated as The preliminary LCLR is calculated as 0. After discarding any points that fall outside the control limits the final UCL is calculated as the final LCLp is calculated as 0, and the R control chart mean is calculated as We now need to calculate the X charts control limits. The preliminary UCLy is calculated as and the preliminary LCL is calculated as After discarding any outlying samples, and repeating until no samples are outside the limits, the final mean is with a final UCL of and a final LCL of