Write a case study

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Write a case study

Post by answerhappygod »

Write a case study
Write A Case Study 1
Write A Case Study 1 (163.93 KiB) Viewed 75 times
Alexander & Thurston, Inc. 1. Background Alexander and Thurston, Inc. sells complex mail sorting equipment to utility companies, insurance firms, and other organizations with high volume mailing requirements. Most of the customers also purchase some kind of service support from A&T. Typically, the service contracts guarantee that downtime will be no more than a certain number of hours per year. Some of the larger customers have inventory and A&T maintenance personnel on site in support of these contracts. Most customers, however, have their equipment serviced by regional technicians. Repair technicians service customer sites (S) by working out of regional facilities (there are roughly 60 facilities across the country), which carry inventories of spare parts. When a facility (F) needs replenishing or when a technician requires a part not available at his/her facility, an order is placed to a distribution center (DC) located in Chicago (Figure 1 illustrates this distribution network). If the order is for an emergency repair (i.e., as opposed to a routine facility replenishment), it is sent out via overnight mail. If the DC is unable to fill an emergency order, it may mean that a customer's machine is down for a long time while the DC waits for the required part to be replenished by internal production or receipt of an order from an outside supplier Because of pressure to live up to the service contracts, facilities are evaluated primarily in terms of customer service, which is measured in terms of hours of downtime experienced by customers. Note that this downtime includes time spent waiting for a repair technician to arrive, time spent waiting for a repair part, actual repair time, and anything else that vents the customer's equipment from functioning. Inventory levels have traditionally been of secondary concern. To support the facilities, management evaluates the DC in terms of fill rate (i.e., fraction of orders met from stock within 24 hours). Traditional performance for the DC has been a fill rate around 85%, although upper management feels that this could be improved to over 90%. (Note that not all service "hits" are due to a lack of inventory. Sometimes they are caused by a heavy backlog of orders, keying mistakes, misplaced inventory, etc., which result in the DC failing to fill an order from a facility within 24 hours, even though it had the required inventory in stock.) The DC manager, who is nominally in charge of all inventory in the system, is also held responsible for inventory levels. Typically, there is $6-7 million in inventory throughout the system with roughly half at the DC and the rest in the field. To balance the concerns of inventory and customer service, the DC makes use of a policy that specifies a reorder point r and a maximum inventory level (i.e., an "order-up-to" level) m for each part in the system. The values of r and m are computed on the basis of total usage of the part for the previous year (u) using the following formulas: Usage Class u250 5<u<50 O<uss u=0 Reorder Point (r) u/3 5/12 5 u/12 - 1 Max Inventory Level (m) 1/2 2 u/3 mu 0 Note that the policy for the case where u=0 (i.e., there was no demand for the part) is to order only when there is demand (i.e., carry no stock for such parts). The facilities and sites are mandated by DC management to use a similar policy for regulating their inventories, where the reorder point is computed as r=u/13, and the maximum inventory level is given by m=u/3, regardless of the usage class. © Wallace J. Hopp 1994 1 F DC S F Figure 1: Spare Parts Distribution Network
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply