a 3 4 A B с А с 50 1. As a production planner in the FCC Company, you were asked to provide a feasible capacity plan for

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

a 3 4 A B с А с 50 1. As a production planner in the FCC Company, you were asked to provide a feasible capacity plan for

Post by answerhappygod »

 1
1 (244 KiB) Viewed 65 times
a 3 4 A B с А с 50 1. As a production planner in the FCC Company, you were asked to provide a feasible capacity plan for the production of the three parts A, B and Cover the planning horizon of 4 weeks. The planned order releases and scheduled receipts are as follows: Week 1 2 300 575 Planned Order 500 200 Releases 2000 Scheduled Receipts Part routing and work center capacity information is given as follows: Routing file Setup Time per Run Time per Part Work Center Batch (min.) Unit (min.) 3.0 5.0 30 2.0 100 120 90 A 1 2 4 3 4 2 4 B 120 30 120 30 3.0 1.0 1.8 0.2 с Work Center Capacities (hrs.) 2 3 Mill Drill 40 40 Turn lathe 40 4 Inspect 40 1/3 (a) Assuming one-week lead time for each operation, make a detailed capacity check to determine the the planned order releases and scheduled receipts are feasible. If not, revise the planned order releases and/or scheduled receipts. (b) Using the Microsoft Excel, draw the load profiles of the work centers in all weeks where a production takes place
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply