Compute The Multifactor Productivity Measure For Each Of The Weeks Shown For Production Of Chocolate Bars Assume 40 Hou 1 (162.04 KiB) Viewed 39 times
Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars. Assume 40-hour weeks and an hourly wage of $16. Overhead is 1.5 times weekly labor cost. Material cost is $9 per pound. (Round your answers to 2 decimal places.) Week 1 2 Output (units) 29,000 34,000 32,000 36,000 Workers 7 8 AWN Material (lbs) 430 480 520 540 8 7 4
Week MFP (Output / Total Cost) 1 2 3 4