= Using the information provided in the table, the network diagram and the project completion time = 25 weeks, reduce th

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

= Using the information provided in the table, the network diagram and the project completion time = 25 weeks, reduce th

Post by answerhappygod »

Using The Information Provided In The Table The Network Diagram And The Project Completion Time 25 Weeks Reduce Th 1
Using The Information Provided In The Table The Network Diagram And The Project Completion Time 25 Weeks Reduce Th 1 (119.06 KiB) Viewed 45 times
= Using the information provided in the table, the network diagram and the project completion time = 25 weeks, reduce the completion time of the project by 3 weeks in the most economical way. Normal Time (weeks) Crash Time (weeks) Normal Cost ($) Maximum weeks Reduced Crash Cost ($) Activity Crash Cost per Week ($) 3 500 2 900 1 400 A B 4 600 3 700 1 100 с 6 800 3 1,352 3 184.00 D 6 1,500 4 2.150 N 325 E 6 1,750 4 2,250 250 N F 5 1,200 5 1,200 0 0 G 7 1,500 5 1,838 2 169 H 3 500 3 500 0 0 B(4) E(6) A(3) C(6) G(7) H(3) D(6) F(5) Reduce G by ✓ week(s), C by week(s), at a cost of $