(2).pdf 4 / 5 - 100% + A Question 2 Exhibit 1 prosents a partial MRP transaction report for the parts necessary to manuf

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

(2).pdf 4 / 5 - 100% + A Question 2 Exhibit 1 prosents a partial MRP transaction report for the parts necessary to manuf

Post by answerhappygod »

2 Pdf 4 5 100 A Question 2 Exhibit 1 Prosents A Partial Mrp Transaction Report For The Parts Necessary To Manuf 1
2 Pdf 4 5 100 A Question 2 Exhibit 1 Prosents A Partial Mrp Transaction Report For The Parts Necessary To Manuf 1 (75.06 KiB) Viewed 51 times
(2).pdf 4 / 5 - 100% + A Question 2 Exhibit 1 prosents a partial MRP transaction report for the parts necessary to manufacture the lamp shown in the product structure to the right. ry Lamp Base Assembly Shah Tobing (2 fout) Pliste Hub Screws (6) Slide Socket Assembly Holder Socket Wiring Amembly Wir (8 feet) Play Conspete the MRP transaction report in the exhibit for the parts and then answer the following questions: 4. Where do the gross requirements for 35 wire assemblies in period 8 come from? What feature of an MRP system allows you to identify the origin of these requirements? B. What actions, if any should be taken in period 17 C. If the gross requirements in period 9 for the lamp were increased by 10 units, what actions, if any should be taken in period 12
100% + Exhibit 1 Lamp Lot for Lot Safety Stock- 3 4 5 6 7 8 Leadtime 1 day 1 2 Gross Requirements Scheduled Receipts On Hand 28 65 10 40 20 Plaaged Order Release us Socket Asensible leadtube-1 day POO -30 Safety Stock - 1 23 56 7 Gross Requirements Scheduled Receipts On Hand 8 Planned Order Release Wiring Assembly Leadtime Day 1 2 Lot for lo Safety Stock 3 4 5 6 7 8 55 Gross Requirements Scheduled Receipts On Hand 5 Planned Order Release Wire Leadtime = 5 Days FOO 50 Foot Spools Safety Stock - 100 feet 1 2 5 6 7 8 Gross Requirements Scheduled Receipts On Hand 800 ft. Planned Order Release 99+