Question 25 of 41 Question 25 10 points Save Answer [CLO-6] A building with 25 flats is being evaluated for 15 years. It

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Question 25 of 41 Question 25 10 points Save Answer [CLO-6] A building with 25 flats is being evaluated for 15 years. It

Post by answerhappygod »

Question 25 Of 41 Question 25 10 Points Save Answer Clo 6 A Building With 25 Flats Is Being Evaluated For 15 Years It 1
Question 25 Of 41 Question 25 10 Points Save Answer Clo 6 A Building With 25 Flats Is Being Evaluated For 15 Years It 1 (39.96 KiB) Viewed 65 times
Question 25 of 41 Question 25 10 points Save Answer [CLO-6] A building with 25 flats is being evaluated for 15 years. It is expected that only 60% of the flats will be rented. The expected construction cost of the building is $100,000 and land cost is $50,000. The estimated annual operation and maintenance cost per flat is $195 and the monthly tax of the building is 0.5% of the land cost. Assume that your IRR = 20%. What should be the minimum annual rent value per flat assuming an average interest rate of 20% per year? Ignore the salvage value of the land and building at the end of the study period.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply