There are six trailers waiting at docking station to be
unloaded. The times required to unload each trailer and the times
that materials they contain are due in the manufacturing are given
in the table:
Trailer
Promised Time (hours)
Unloading Time (hours)
A
10
6
B
5
4
C
35
15
D
25
18
E
20
10
F
15
12
There are six trailers waiting at docking station to be unloaded. The times required to unload each trailer and the time
-