1. An earth moving contractor encounters a trap-rock formation at shallow depth ma cut. Seismographic tests widicate a s

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

1. An earth moving contractor encounters a trap-rock formation at shallow depth ma cut. Seismographic tests widicate a s

Post by answerhappygod »

1 An Earth Moving Contractor Encounters A Trap Rock Formation At Shallow Depth Ma Cut Seismographic Tests Widicate A S 1
1 An Earth Moving Contractor Encounters A Trap Rock Formation At Shallow Depth Ma Cut Seismographic Tests Widicate A S 1 (42.99 KiB) Viewed 46 times
1. An earth moving contractor encounters a trap-rock formation at shallow depth ma cut. Seismographic tests widicate a seismie velocity of 5.500 fps for the material. On this basis, it is proposed to rip the rock with a 370 hp crawler tractor Estimate the production in bey, for Full-time ripping with efficiency based on 50 minutes hour. Assume that the ripper is equipped with single shank and that ripping conditions are average (ie, intermediate . between extreme conditions. The Normal Oco cost per hour, including operator, for a 370 hp tractor with ripper is $ 105. 95. This is classified as heavy ripping. Lising your entimale of hourly production, cetimate the rippuentroduction cost in doller for bey without operator. [20 points. I
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply