A civil engineer has calculated that a new construction project requires 15,000 yd3 of fill with relative compaction of

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

A civil engineer has calculated that a new construction project requires 15,000 yd3 of fill with relative compaction of

Post by answerhappygod »

A Civil Engineer Has Calculated That A New Construction Project Requires 15 000 Yd3 Of Fill With Relative Compaction Of 1
A Civil Engineer Has Calculated That A New Construction Project Requires 15 000 Yd3 Of Fill With Relative Compaction Of 1 (42.14 KiB) Viewed 39 times
A civil engineer has calculated that a new construction project requires 15,000 yd3 of fill with relative compaction of 93%. The closest borrow pit area has a soil with in-place dry density of 95 pcf and a laboratory maximum dry density of 118 pcf. What will be the total volume of the soil needed to be excavated from the borrow pit by the contractor? 12,983 yd 3 O 13,729 yd3 + O 17,329 yd3 O 19,283 yd 3 QUESTION 4 Determine the cycle time for a single-engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900 ft away under severe conditions. The average haul speed will be 14 mph and the average return speed will be 20 mph. Assume, at an average speed of 5 mph that 200 ft is required to bo accelerate and decelerate. The operating efficiency will be equal to a 50-min hour. It will take 0.80 min to load this scraper 2.51 min None 3.45 min 4.47 min 4.12 min