5 points In designing your building, you have put columns on an approximately 30 ft x 30 ft grid. You are trying to deci

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

5 points In designing your building, you have put columns on an approximately 30 ft x 30 ft grid. You are trying to deci

Post by answerhappygod »

5 Points In Designing Your Building You Have Put Columns On An Approximately 30 Ft X 30 Ft Grid You Are Trying To Deci 1
5 Points In Designing Your Building You Have Put Columns On An Approximately 30 Ft X 30 Ft Grid You Are Trying To Deci 1 (71.68 KiB) Viewed 50 times
5 points In designing your building, you have put columns on an approximately 30 ft x 30 ft grid. You are trying to decide between concrete post-tensioned flat plate and concrete panjoist with post tensioned girders. Which of the following is a true? Post-Tensioned Concrete flat plate will use more total concrete, but will give you a thinner total structural floor assembly. The pan joist system will require you to add more columns. You should not use the flat plate system if it is a residential building. The concrete panjoist system will deflect more under a similar load.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply