ample 2 concreting Operation: Quantity of concrete to pour: 500 ft3 Normal work hours: 8 hours/day Overtime rate = 1.5 o

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

ample 2 concreting Operation: Quantity of concrete to pour: 500 ft3 Normal work hours: 8 hours/day Overtime rate = 1.5 o

Post by answerhappygod »

Ample 2 Concreting Operation Quantity Of Concrete To Pour 500 Ft3 Normal Work Hours 8 Hours Day Overtime Rate 1 5 O 1
Ample 2 Concreting Operation Quantity Of Concrete To Pour 500 Ft3 Normal Work Hours 8 Hours Day Overtime Rate 1 5 O 1 (53.26 KiB) Viewed 42 times
ample 2 concreting Operation: Quantity of concrete to pour: 500 ft3 Normal work hours: 8 hours/day Overtime rate = 1.5 of the normal rate Productivity during an overtime hour = 90% Cost of ready-mixed concrete (M12) = $17/ft3 Find the total time & cost required to finish the job using both methods of construction - Labor LI Description General Laborer Concrete Worker Rate S/hr 15 Equipment E2 Description Crane & Bucket Pump & Tool Rental S/hr Operational S/hr 40 10 15 5 L4 25 E14 Crew C16 Description Concrete Crew Output/Day 100 Unit ft Composition 2L1 + 3L4 + 1E2 +2E14 Resources Method of Construction Method 1 Method 2 Description Concreting by Pump (8hrs/day) Concreting by Pump (14hrs/day) Unit ft At 1 C16+ M12 1 C16+ M12 5 Lecture 9 Construction Management