1) Opets circuit test on a transformer is conducted to obtain: (A) the leakage in pedances (C) lysteresis loss only (B) eddy current loss only. (D) core loss only 2) The voltage regulation of the transformer is: (A) Positive with unity and lagging power factor loads (B) Negative with leading power factor loads (C) Positive with lagging power factor loads (D) All of the above
8) You can't unload: (A) Series motor (B) Series generator (C) Shutt motor (D) Separately excited generator
1) Opets circuit test on a transformer is conducted to obtain: (A) the leakage in pedances (C) lysteresis loss only (B)
-