Need to fill in the length, dimension, qty(pcs) and qty
(bf).
. = 2) ROOF FRAMING - Prepare a material take-off using the roof framing plan shown in attached Figure 2. On your take-off sheet incorporate the information contained within the following chart. (20 points) Estimator's Information Lumber lengths: 8', 10', 12”, 14”, 16', 18', 20, 22', 24' Calculations: add 2 studs for every corner, add 3 studs for every opening Assume the sole plate extends through the door openings GLB = glue laminated beam. Rafters: 2 x 8 @ 16" O.C. Roof slope: 6:12 Hip rafters: 1-1/2" x 12"H Glue Laminated Beams (GLB's") Fascia board: 1" x 12" Deck: 4'-0" x 8'-0" Wall Height: 11'-6" Exterior stud wall construction: 2 x 6 wood studs, 16" O.C., sill plate, double top plate, no wall openings . .
Common rafters Hip rafter Ridge Line of exterior wall below King rafter Jack rafters 26' 30 Fascia 38 42'
| Length (FT) Dimension (HxWxL) Qty (pcs) Qty (BF) Hip Rafters Common Rafters Ridge Board Jack Rafters King Rafters Fascia
. = 2) ROOF FRAMING - Prepare a material take-off using the roof framing plan shown in attached Figure 2. On your take-o
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
. = 2) ROOF FRAMING - Prepare a material take-off using the roof framing plan shown in attached Figure 2. On your take-o
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!