Q14. A contractor is excavating the below trench. The contractor is supposed to dig the trench 5ft deep and 3ft wide. The soil was tested to have an approximately swell factor of 112% and a shrinkage factor of 14%. The contractor is placing a 10" water pipe in the trench and then backfilling with the soil that was removed. The dimensions are on center line. Does the contractor have enough soil to backfill the trench, or will he/she have to need more? If more soil are needed, how much does the contractor need to bring in. Answer in LCY. (12 points) 4011 311 161 17 40H 2011 24h 6011
formulas symbol LCY BOY . Table 80.1 Surmary of Excavation Soil Factors example Vidur quantity or units swell factor hraped factor SF 1.20 Thank to loose surinkage factor shrink Intor 0.15 bank to compacted] low factor LF 0.83 Doone to bank) fill factor dipper factor FF bilability operator factor OF 0.53 DE ССҮ BCY Te 7 - BCY LOY XBCY LCY 120 yd loome volume loose cubie yards compacted volume compacted cube yards bank volume bank cube yanda XBCY (cy 85y! CCY BICY 100 yd occupied volume solid capacity of bucket, dipper, or track actual production ideal production SFX BCY BOY LF DF (1-DF)BCY SH LCY CCY SF 1-DF LCY - DCY (Increase (SF-1)BCY LCYBCY BOY (SF-1)x 100 Cinema) BCY-CCY (dec) DFBOY BICY-CCY 100% BCY DP 100 (dec) 1-LE LI XDCY 20 ya SWL x 100% 1-L LE x 100% 20% 15 y shrink SIIR 15
Q14. A contractor is excavating the below trench. The contractor is supposed to dig the trench 5ft deep and 3ft wide. Th
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Q14. A contractor is excavating the below trench. The contractor is supposed to dig the trench 5ft deep and 3ft wide. Th
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!