The following data relates to a mining project with increasing waste rock to ore ratio as the mine life progresses, givi

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

The following data relates to a mining project with increasing waste rock to ore ratio as the mine life progresses, givi

Post by answerhappygod »

The following data relates to a mining project with increasing
waste rock to ore ratio as the mine life progresses, giving
declining production per year.
Cost dollars and production are in thousands.
Year
0
1
2
3
4
5
Production, (‘000 tonnes)
62
53
35
24
17
Selling Price, ($/tonne)
26.0
26.0
26.0
27.3
28.7
Mine Development Cost (‘000 $)
750
250
Mining Equipment Cost (‘000 $)
670
Mineral Rights Acquisition Cost (‘000 $)
100
Operating Costs (‘000 $)
175
193
212
233
256
Assume:
Royalties are 14% of gross revenue. Liquidation value at Year 5 is
zero.
A) Calculate before tax annual cash flow, ROR, NPV and PVR for a
15% minimum (8 points).
B) Calculate the break-even price per tonne of ore that, if
received uniformly from years 1 through 5, would give the project a
15% IRR (5 points).