Air-conditioning Design Assignment [60 marks] Table below listed the condition of atmospheric air before and to be achie

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Air-conditioning Design Assignment [60 marks] Table below listed the condition of atmospheric air before and to be achie

Post by answerhappygod »

Air Conditioning Design Assignment 60 Marks Table Below Listed The Condition Of Atmospheric Air Before And To Be Achie 1
Air Conditioning Design Assignment 60 Marks Table Below Listed The Condition Of Atmospheric Air Before And To Be Achie 1 (94.15 KiB) Viewed 36 times
Air-conditioning Design Assignment [60 marks] Table below listed the condition of atmospheric air before and to be achieved after going through an air-conditioning process or processes. Before air-conditioning To be achieved after air- conditioning Case 1 Dry bulb temperature, Tdb = 30°C Relative humidity, = 45% Case 2 Dry bulb temperature, Tab 18°C Relative humidity, -40% Dry bulb temperature of 22°C ≤ Tab≤27°C and relative humidity of 40 ≤ ≤ 60% Case 3 Dry bulb temperature, Tab - 35°C Relative humidity, -80% You are required to design an air conditioning process or processes for all the 3 cases above separately when the pressure of atmospheric air is at 1 bar and the volumetric flow rate of the atmospheric air is 10 m³/min. Present the design of process for each case separately which shall include: a) Sketch a schematic diagram of the equipment used for the designed process/processes. [3 marks each case] b) Present neatly the mass balance equation for dry air, mass balance equation for water vapor and energy balance equation for the designed process/processes. [3 marks each case] c) Determine the amount of water removal/added rate and/or the amount of heat added/removal rate for the designed process/processes. [10 marks each case] d) Sketch the process path for the designed process/processes on a Psychrometric chart. [4 marks each case]
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply