MOVING SOIL FROM THE FARM USING SCRAPER(S) THE FIRST THING TO DO IS SET UP A SCRAPER PROBLEM USE THE PROJECT REQUIREMENT

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

MOVING SOIL FROM THE FARM USING SCRAPER(S) THE FIRST THING TO DO IS SET UP A SCRAPER PROBLEM USE THE PROJECT REQUIREMENT

Post by answerhappygod »

Moving Soil From The Farm Using Scraper S The First Thing To Do Is Set Up A Scraper Problem Use The Project Requirement 1
Moving Soil From The Farm Using Scraper S The First Thing To Do Is Set Up A Scraper Problem Use The Project Requirement 1 (44.99 KiB) Viewed 46 times
Moving Soil From The Farm Using Scraper S The First Thing To Do Is Set Up A Scraper Problem Use The Project Requirement 2
Moving Soil From The Farm Using Scraper S The First Thing To Do Is Set Up A Scraper Problem Use The Project Requirement 2 (36.35 KiB) Viewed 46 times
Moving Soil From The Farm Using Scraper S The First Thing To Do Is Set Up A Scraper Problem Use The Project Requirement 3
Moving Soil From The Farm Using Scraper S The First Thing To Do Is Set Up A Scraper Problem Use The Project Requirement 3 (50.82 KiB) Viewed 46 times
Moving Soil From The Farm Using Scraper S The First Thing To Do Is Set Up A Scraper Problem Use The Project Requirement 4
Moving Soil From The Farm Using Scraper S The First Thing To Do Is Set Up A Scraper Problem Use The Project Requirement 4 (36.42 KiB) Viewed 46 times
MOVING SOIL FROM THE FARM USING SCRAPER(S) THE FIRST THING TO DO IS SET UP A SCRAPER PROBLEM USE THE PROJECT REQUIREMENTS AS YOUR GIVENS: SCRAPER MODEL: SEE PROJ REA'TS ROLLING RESISTANCE SEE PROJ REQ'TS LOAD TIME: USE NORMAL 0.85 MIN @ 96% CAPACITY (P235) EFFICIENCY SEE PROJECT REQ'TS HAUL ROAD LENGTH & GRADE: SEE PROJ REQ'TS SWELL FACTOR DENSITIES IN PROJ REQ'TS. STEP 1 CREATE THE TABLE TO DETERMINE TRAVEL TIME DISTANCE 22% 42 TR SPEED TIME 200 LOADED X 200 200 X 200 NOTES REMEMBER YOUR 200 FT ACCEL & DECEL SEGMENTS • SPEED COMES FROM THE CHARTS ON PAGES 232 233 • TIME COMES FROM THE EQUATION ON PAGE 239 TOTAL CYCLE TIME = TRAVEL TIME (FROM ABOVE) + LOAD TIME (p235) + DUMP TIME (p 243) + TURN TIME (p243) THIS GIVES YOU HOW MUCH TIME (IN MINUTES) FOR HOW LONG IT TAKES TO MAKE ONE CYCLE. So: How MANY FULL CYCLES CAN ONE SCRAPER MAKE OUR SO MINUTE HOUR? EMPTY STEP 2:
STEP 3: How MUCH DOES OUR SCRAPER CARRY IN BOY/HR ? LOOSE CAPACITY OF SCRAPER X SWELL FACTOR X 1.1 (p231) (You CALCULATE) ↑ THIS FACTOR FOR SCRAPERS ONLY STEP 4 SCRAPER CAN CARRY MULTIPLY WHAT YOUR IN BEY TIMES HOW MANY CYCLES IT CAN DO PER HOUR. THIS IS YOUR SCRAPER PRODUCTION FOR I MACHINE IN BCY/HR. STEP 5: IF YOU ARE USING ONLY I MACHINE, HOW MANY HOURS WILL IT TAKE TO MOVE THE 7500 BCY FROM THE FARM? (REMEMBER AHR, SHE BULE) STEP 6: SET UP YOUR CREW (SEE PRAN REQTS) HRS $ per He= 1 SCRAPER C 1 D7 DIZER @ 1 GRADER @ COMPACTOR(S). HRS * $ par He: HRS $ per He= HRS X $ perte = 1 SUPERVISOR @ 1 LABORER +425 × $ HRS X $ per He- per HQ= MOVES FOR EACH PIECE NOT ALREADY THERE: TOTAL = STEP 7: WHAT HAPPENS IF YOU ADD MORE SCRAPERS? STEP & CHOOSE YOUR BEST COMBINATION HINTS: REMEMBER MOVES FOR EACH ADDITIONAL SORAPER : YOU KNOW WHAT YOUR ROLLER CAN DO PER HOUR. BE SURE YOU DON'T NEED MORE. REMEMBER THE MOVES FOR EXTRA PIECES REMEMBER THE THE + 8 HR RULES
4) TRUCKS = OFF HIGHWAY TRUCKS CARRY 15 LET OVER THE ROAD TRUCKS CARRY 10 LEY AT 75% OF THE POSTED SPEED LIMIT. 5) EQUIPMENT > • EXCAVATOR/BACKHOE & LOADER ALL HAVE 3 CY BUCKETS • GRADER NEEDED FOR HAUL ROAD MAINT • EACH PIECE OF EQUIPMENT HAS A FIXED DELIVERY OF $500 • SOIL COMPACTION REQUIRES 6 INCU LIFTS; 6 PASSES/LIFT AT 4 MPH • REPLACING TOPSOIL DOES NOT REQUIRE COMPACTION AND USES TUS D3 DOZER •ALL EQUIPMENT RUNS AT A 50 MINUTE EFFICIENCY. OPERATING COSTS/H₂ OPERATOR WAGES (INCL. BENEFITS, ETC) • OVER THE ROAD TRUCKS : $60.00 $30.00 • D7 DOZER (IDEAL: 200 LCY/H₂) = $115.00 $35.00 • 3 CY EXCOVATOR OR LOADER : $125.00 $35.00 • 120H GRADER $60.00 $35.00 • OFF HIGHWLY TRUCKS : $75.00 $30.00 • 631E SCRAPERS : $155.00 $35.00 • 5 FT WIDE COMPACTORS * $75.00 $35.00 $ $ 70,00 $30-00 • D3 DOZER (FOL TOPSOIL REPLACEMENT) • SUPERVIS02 • LABORER $50.00 $25.00 NOTE NO OVER TIME WILL BE ALLOWED ON ≤ 4 HRS = 1/2 DAY THIS JOB = 8 4es FULL DAY FOR YOUR FINAL BID USE 25% OVERHEAD + PROFIT. WE WILL DIVIDE PROJECT PART & INTO 4 SECTIONS SECTION 1 SECTION 2 STRIP THE TOPSOIL AND MOVE THE CUT ON SITE BRING SOIL FROM THE FARM USING SCRAPERS SECTION 3 BRING SOIL FROM THE FARM USING AN EXCAVATOR OR LOADER AND CHECKING IF ON ROAD OR OFF ROAD TRUCKS ARE BETTER SECTION 4 PLACING AND GRADING CRUSHED STONE, CONCRETE AND ASPHALT SUBCONTRACTORS, REPLACE TOPSOIL SUBMIT FINAL BID. 6) COSTS :
CREW REQUIREMENTS STRIP TOPSOIL: D7 DOZER (S), SUPERVISOR, LABORER MOVE CUT 3 D7 DOZER (S), SUPERVISOR, LABORER, COMPACTOR. BRING SOIL FROM THE FARM: 4) SCRAPER (<), I D7 DOZER TO PUSH AT THE FARM, 1 GRADER TO MAINTAIN THE HAUL ROAD, COMPACTOR(3), SUPERVISOR, LABORER B) 1 EXCAVATOR (SELECT EITHER A BACKHOE OR LOADER), OFF ROAD TRUCKS, 1 GRADER FOR THE HAUL ROAD, 1DT DOZER ON THE JOBSITE, COMPACTOR(S), SUPERVISOR, LABORER c) I EXCAVATOR (SAME AS ABOVE), ON ROAD TRUCKS, 1 D7 DOZER ON THE JOBSITE, COMPACTOR(S), SUPERVISOR LABORER PLACE + GRADE STONE HOW MUCH STONE DO YOU NEED ? YOU CAN ONLY PLACE & GRADE 500 ccy / DAY. (Bhrs). 1 D7 DOZER, 1 GRADER, 1 COMPACTOR, SUPERVISOR, LABORER CONCRETE SUB: HOW MANY LINEAR FEET OF GUTTER DO YOU HAVE? THE SUBS TAKES 5 DAYS: 2 TO PLACE (YOUR SUPERVISOR NEEDS TO BE THERE) 3 DAYS TO CURE. ASPHALT SUB: HOW MANY TONS OF ASPHALT DO YOU HAVE? IT TAKES 2 DAYS (YOUR SUPERVISOR NEEDS TO BE THERE). REPLACE TOPSOIL (ONLY IN THE RO.w.). THIS WILL TAKE 4 HES WITH A LOADER, THE (D3) SMALL DOBER, SUPERVISOR + LABORER REMEMBER EVERY MOVE OF EQUIPMENT COSTS $500 FULL DAYS ARE 8 HRS. (NO OVERTIME OR SATURDAYS) 1/2 DAYS ARE ≤ 4 Hes