13. Installation of Manhole (MH 1) Estimate: Equipment: Excavator (Track-hoe): ||0 Loader Backhoe: Bo Labor: Operating E

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

13. Installation of Manhole (MH 1) Estimate: Equipment: Excavator (Track-hoe): ||0 Loader Backhoe: Bo Labor: Operating E

Post by answerhappygod »

13 Installation Of Manhole Mh 1 Estimate Equipment Excavator Track Hoe 0 Loader Backhoe Bo Labor Operating E 1
13 Installation Of Manhole Mh 1 Estimate Equipment Excavator Track Hoe 0 Loader Backhoe Bo Labor Operating E 1 (27.38 KiB) Viewed 36 times
13 Installation Of Manhole Mh 1 Estimate Equipment Excavator Track Hoe 0 Loader Backhoe Bo Labor Operating E 2
13 Installation Of Manhole Mh 1 Estimate Equipment Excavator Track Hoe 0 Loader Backhoe Bo Labor Operating E 2 (53.03 KiB) Viewed 36 times
13. Installation of Manhole (MH 1) Estimate: Equipment: Excavator (Track-hoe): ||0 Loader Backhoe: Bo Labor: Operating Engineer: 2x 74x2 = 148 Laborer Foreman 66 Laborer: 58 Materials: Pre-cast Concrete Manhole: \000 Manhole Casting and Lid: 200 #57 Stone: 13.70 Other: Total Installation Cost: 14. What is the unit cost of installation of the Manhole (MH 1)-($/each)?
INSTALLATION TIMES THESE DO NOT INCLUDE EXCAVATION TIMES Storm Manhole: Install base material, manhole base, barrel sections, eccentric cone, casting and compacted backfill: Three hours per manhole. Catch Basins and Inlets: Install base material, pre-cast concrete box, pre-cast concrete top slab, casting and compacted backfill: Two and one half hours per unit. Storm Sewer Conduit Installation: Install bedding (if required), install conduit, install initial backfill, install and compact backfill: Assume 1.0 times the estimated excavation time. MATERIAL COSTS-STORM SEWER Type A Manhole, Class B: M.H. Casting & Lid: $1,000.00 Each $200.00 Each COC Standard Catch Basin: $450.00 Each Standard Catch Basin Grate: $250.00 Each 12" RCP Conduit: # 57 Stone: $7.95 per Linear Foot $13.70 per ton delivered Hydraulic Excavator: Loader Backhoe: Dump Truck: Track Loader: Operating Engineer: Laborer Foreman Laborer: EQUIPMENT COSTS $110.00/ Hour $50.00/Hour $45.00/ Hour $70.00/Hour LABOR COSTS $74.00/Hour $66.00/Hour $58.00/Hour