L

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

L

Post by answerhappygod »

L
L 1
L 1 (84 KiB) Viewed 26 times
Question 2 2.1 The drawing shows a plan and cross-sectional diagrams of a circular reservoir with an inside diameter of 20 m. The wall is 3 m high and 200 mm thick. A concrete base of the circular reservoir has a diameter of 21.2 m and rests on a concrete blinding layer of 75 mm thickness, which has a diameter of 21.5 m. Make use of the Quantities Grid to calculate the quantities (in standard metric units) for the following: (2.1.1) Excavations. (2.1.2) Concrete for the: 2.1.2.1. Blinding layer, and 2.1.2.2. Base and wall. (2.1.3) Formwork of the wall only. (2.1.4) Finishing of the floor and wall only. (20) 20000 INSIDE DIAMETER PLAN OF THE CIRCULAR RESERVOIR 20000 INSIDE DIAMETER 200 Pe 2:00 400 BASE BLINDING 21500 Drawing Not To Scale SECTIONAL VIEW OF CIRCULAR RESERVOIR 0000 75 500
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply